13th Street

Scope of Work


The project milled 1"'1.5" of entire roadway, followed by a 2-inch Type D Hotmix asphalt overlay.

Location


  • E. Adams Street to E Washington Street

Budget Summary


Material Type
Amount Used
Estimated Cost
Concrete mix
0
$0
Emulsions
 170 gallons
$500
Asphalt
100 tons
$6,000
  Total
$6,500

Issues


  • Utility spotting by Dig Test and BPUB
  • Asphalt quality tested; Passed
  • Project considered urgent due to upcoming Charro Days festivities

Timeline


  • Milling/Preparation: February 21, 2012
  • Paving: February 22, 2012

East Levee Street to East Elizabeth Street



Street Dimensions


  • 22 feet by 275 feet (0.06 road miles)

Project Managers


  • Daniel Salinas, Roy Villanueva

Funding Source


  • Capital Improvement Project Funding
13th Street

Scope of Work


The project milled 1"'1.5" of entire roadway, followed by a 2-inch Type D Hotmix asphalt overlay.

Location


  • East Levee Street to East Elizabeth Street

Budget Summary


Material Type
Amount Used
Estimated Cost
Concrete mix
0
$0
Emulsions
170 gallons
$500
Asphalt
100 tons
$6,000
  Total
$6,500

Issues


  • Utility spotting by Dig Test and BPUB
  • Asphalt quality tested; Passed

Timeline


  • Milling/Preparation: March 26-27, 2012
  • Paving: March 27-28, 2012